服务热线:13859969390
网站首页 About us
Company profile
News Center
Company news Industry news
Product display
Mould Diecasting Mould for Aluminum CNC Lathe machining Precision Machined parts Hardware accessories processin Medical equipment Plastic products processing Inspection fixture
Production strength
Enterprise environment Production workshop Production equipment Die casting workshop
Online Message
Contact us
关闭
Company news 分类

What is the installation sequence of metal stamping die

日期:2020-11-29  

(1) the height of the die is located at the bottom of the die according to the height of the die. The distance between the center and the table is greater than the closing height of the die. First, slide the block up to the top stop point, put the mold on the specified position of the pressure table, then stop the slide at the bottom stop point, then adjust the height of the slide block, so that the mold with the bottom handle and the upper plane contact the mold base, and the mold handle is inserted into the hole of the mold handle, and the mold handle is fixed by the clamp and screw on the slide block. For large punch without die handle, the upper die seat is usually fixed on the press slide seat with screws, etc., while the lower die seat is initially fixed on the press table (without screws). ③ Adjust the slider of the press for 3-5mm, start the press, and the idle stroke is 1-2 times. Stop the slider at the bottom dead center and fix the lower die base. ④ Try to punch holes and gradually adjust the slider to the desired height. If the upper die has ejector, adjust the discharge bolt on the press to the required height.

地址:Xiamen factory: No.1 Workshop, No.236 Chiping Road, Tong'an District, Xiamen
X