What is the installation sequence of metal stamping die
(1) the height of the die is located at the bottom of the die according to the height of the die. The distance between the center and the table is greater than the closing height of the die. First, slide the block up to the top stop point, put the mold on the specified position of the pressure table, then stop the slide at the bottom stop point, then adjust the height of the slide block, so that the mold with the bottom handle and the upper plane contact the mold base, and the mold handle is inserted into the hole of the mold handle, and the mold handle is fixed by the clamp and screw on the slide block. For large punch without die handle, the upper die seat is usually fixed on the press slide seat with screws, etc., while the lower die seat is initially fixed on the press table (without screws). ③ Adjust the slider of the press for 3-5mm, start the press, and the idle stroke is 1-2 times. Stop the slider at the bottom dead center and fix the lower die base. ④ Try to punch holes and gradually adjust the slider to the desired height. If the upper die has ejector, adjust the discharge bolt on the press to the required height.